Two bridges and feeder roads on the national route at Thessaloniki-Katerini and Thessaloniki-Evzoni junctions
2nd WORKS CONTROL DIRECTORATE – 3rd REGIONAL PUBLIC WORKS DEPT.

The project was about the completion of the feeder roads at the junction to Evzoni and the construction of two prestressed steel-reinforced-concrete bridges. Their foundation is constructed with well piles (diameter Φ100, depth 48-62m). The bridge over the Athens-Evzoni feeder road is 105m long (three equal 35m-long spans). The bridge over the Thessaloniki-Athens feeder road is 102m long (30m, 42m and 30m-long spans). Moreover, two junction roads with two traffic lanes (3+3m wide, 900m and 1200m long) were constructed.

 

view more  BRIDGES PROJECTS