The project concerned the construction of an office building, workshop and warehouse in the Industrial area of Sindos, with a total surface of 2200m2. The bearing structure of the building consists of steel columns and steel members of 30m span.
The building is divided in three sections: the office building with a surface of 1000m2 (in two levels), the workshop with a surface of 400m2, including a crane-bridge that can lift up to 10tons, and the warehouse (800m2). The project was completed in the minimum time of 150 days.
view more STEEL CONSTRUCTIONS